[ back ]


title

PRE-ARRANGED PATHS (PAPS) for Timetable 2023

The Pre-arranged Paths (PaPs) on RFC Amber for Timetable 2023 have been published

The Pre-arranged Paths (PaPs) for Timetable 2023 are now published and accessible in Path Coordination System (PCS). Our offer, prepared in close cooperation with other Rail Freight Corridors enables rail freight cconnections between terminals in Central and Eastern Europe with the Port of Koper.

More details on PaPs for Timetable 2023 in RFC Amber can be found in our DigCat at the link

Path requests for the Timetable 2023 might be submitted until 11 April 2022 by using PCS as the unique booking tool for PaPs via following link https://pcs-online.rne.eu/pcs/#/login

 

For any questions or support do not hesitate to contact the C-OSS Manager 

We work

Together

  • brand
  • brand
  • brand
  • brand
  • brand
  • brand
  • brand